Pueblo drone pilot pueblo-drone-pilot.stoagen.com · a proposal, not a program
Proposal under developmentThis site presents options for community discussion. No aircraft has been selected, no program has been approved, and no funds have been awarded.

Sequence and risks

Timeline and risks

Where the project stands (research and this site), the six phases of the scaled-down pilot (site engineering, aircraft selection, pilot training, a flight-history record, public-safety participation, then the BVLOS decision), and the risks already identified with their mitigations.

The sequence

The first action is not contacting drone vendors, and under the revised plan the aircraft is chosen only after the site is measured. Proposal The order:

Risks already identified

Risk Why it matters Early mitigation
Grant cycle missed The FY26 first step has passed Prepare the next cycle; check whether the county already filed; pursue parallel sources
Aircraft or payload not eligible Blue status is configuration-specific and changes Save dated DCMA evidence; get the awarding agency's written approval before purchase
Package exceeds $200,000 Camera, link, site, and training can exceed the aircraft cost Capped line items; host-funded private elements; a reduced-scope alternate
Aircraft weight crosses 55 lb Changes the FAA path Weigh the complete configuration; prefer a sub-55 configuration for Part 107
Remote link fails Loss of control or video is a safety risk Dual backhaul, local failsafes, tested lost-link routes, UPS, health monitoring
Altitude, heat, and wind cut endurance Brochure tests may be near sea level Require local payload demonstration and conservative reserves
Hybrid fuel, noise, and maintenance burden Launch-ready storage is harder than battery docking Code-compliant enclosure, scheduled inspections, trained servicing, a noise test
Public concern over surveillance Can stop the project or damage trust Publish policy early; no facial recognition; limited retention; audit logs; reporting
Host or customer feed exposes evidence Privacy and case risk Separate streams and accounts; county kill switch; delayed or sanitized view
Plate-reading expectations exceed optics Performance varies sharply Controlled testing; publish measured results only
Overlap with existing city and county programs Duplication weakens the grant Treat interoperability and regional coverage as design requirements
Vendor lock-in Proprietary controls and subscriptions create recurring cost Require data export, documented interfaces, support terms, an exit plan

Sources: the research report, sections 2, 18, and 19 · report.md · checked 2026-08-23

Ask your AI about this page

Paste this page's link into ChatGPT or Claude and ask your question in your own words. Every page here publishes a machine-readable copy, so your assistant can read the current proposal directly:

https://pueblo-drone-pilot.stoagen.com/timeline/

Published . Last updated . Times come from this page's revision history and can be checked against it.